middle.news
Turaco Gold Unveils 1.5km High-Grade Extension at Adiopan Prospect
9:26am on Tuesday 27th of January, 2026 AEDT
•
Mining
Read Story
Turaco Gold Unveils 1.5km High-Grade Extension at Adiopan Prospect
9:26am on Tuesday 27th of January, 2026 AEDT
Key Points
1.5km strike extension confirmed at Adiopan prospect
High-grade gold intersections with broad widths reported
New parallel mineralised shears discovered over 500m strike
Afema Project MRE update due in Q1 2026 to incorporate results
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Turaco Gold (ASX:TCG)
OPEN ARTICLE