middle.news

How VBX’s Metallurgical Optimisation Could Boost Wuudagu Bauxite Output by 34%

9:40am on Tuesday 27th of January, 2026 AEDT Mining
Read Story

How VBX’s Metallurgical Optimisation Could Boost Wuudagu Bauxite Output by 34%

9:40am on Tuesday 27th of January, 2026 AEDT
Key Points
  • 23% to 34% increase in product mass recovery compared to 2025 Pre-Feasibility Study
  • Potential 20-30% uplift in annual production capacity from improved beneficiation
  • High-quality, low-silica bauxite product grades maintained across various screen sizes
  • Optimised scrubbing process reduces water, power consumption, and costs
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Vbx (ASX:VBX)
OPEN ARTICLE