middle.news
How Is Strike Energy Advancing South Erregulla While Optimising Gas Production?
9:54am on Thursday 29th of January, 2026 AEDT
•
Energy
Read Story
How Is Strike Energy Advancing South Erregulla While Optimising Gas Production?
9:54am on Thursday 29th of January, 2026 AEDT
Key Points
South Erregulla 85 MW Peaking Gas Power Project 72% complete, on track for October 2026
Walyering production at 1.59 PJ, with $16.6 million revenue at ~$7.36/GJ
Production reduced to 10 TJ/day to optimise supply reliability amid favourable market conditions
Walyering West-1 drilling planned for early Q2 CY26, subject to approvals
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
STRIKE ENERGY (ASX:STX)
OPEN ARTICLE