middle.news

How Is Strike Energy Advancing South Erregulla While Optimising Gas Production?

9:54am on Thursday 29th of January, 2026 AEDT Energy
Read Story

How Is Strike Energy Advancing South Erregulla While Optimising Gas Production?

9:54am on Thursday 29th of January, 2026 AEDT
Key Points
  • South Erregulla 85 MW Peaking Gas Power Project 72% complete, on track for October 2026
  • Walyering production at 1.59 PJ, with $16.6 million revenue at ~$7.36/GJ
  • Production reduced to 10 TJ/day to optimise supply reliability amid favourable market conditions
  • Walyering West-1 drilling planned for early Q2 CY26, subject to approvals
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about STRIKE ENERGY (ASX:STX)
OPEN ARTICLE