middle.news

How Will Horizon’s Black Swan Hub Expansion Transform Gold Production?

9:42am on Friday 30th of January, 2026 AEDT Mining
Read Story

How Will Horizon’s Black Swan Hub Expansion Transform Gold Production?

9:42am on Friday 30th of January, 2026 AEDT
Key Points
  • Black Swan Processing Hub throughput upgraded from 1.5Mtpa to 2.2Mtpa
  • Safe completion of Boorara and Phillips Find open pit mining
  • Gold sales of 3,689oz generating approximately $23.3 million revenue
  • Exceptional high-grade drilling results at Burbanks with ultra-high grade intercepts
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about HRZ
OPEN ARTICLE