middle.news

Audalia Unveils Maiden Ore Reserve with AUD 227M NPV at Medcalf

8:10pm on Friday 30th of January, 2026 AEDT Mining
Read Story

Audalia Unveils Maiden Ore Reserve with AUD 227M NPV at Medcalf

8:10pm on Friday 30th of January, 2026 AEDT
Key Points
  • Maiden JORC 2012 Ore Reserve of 11.77Mt at 11.0% TiO2
  • Two development options – high CAPEX/low OPEX and low CAPEX/high OPEX
  • Strong economic metrics – NPV up to AUD 227M and IRR between 64% and 164%
  • 9-year mine life with 1-year payback period
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Audalia Resources (ASX:ACP)
OPEN ARTICLE