middle.news
Audalia Unveils Maiden Ore Reserve with AUD 227M NPV at Medcalf
8:10pm on Friday 30th of January, 2026 AEDT
•
Mining
Read Story
Audalia Unveils Maiden Ore Reserve with AUD 227M NPV at Medcalf
8:10pm on Friday 30th of January, 2026 AEDT
Key Points
Maiden JORC 2012 Ore Reserve of 11.77Mt at 11.0% TiO2
Two development options – high CAPEX/low OPEX and low CAPEX/high OPEX
Strong economic metrics – NPV up to AUD 227M and IRR between 64% and 164%
9-year mine life with 1-year payback period
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Audalia Resources (ASX:ACP)
OPEN ARTICLE