middle.news
How Caravel Minerals’ Adani MoU and Engineering Advances Could Transform Its Copper Project
1:22pm on Friday 27th of February, 2026 AEDT
•
Mining
Read Story
How Caravel Minerals’ Adani MoU and Engineering Advances Could Transform Its Copper Project
1:22pm on Friday 27th of February, 2026 AEDT
Key Points
90% completion of Definitive Engineering Study with reduced water use
Secured draft grid connection offer for 89MW winter capacity
MoU signed with Kutch Copper (Adani) for offtake and investment
Environmental approvals progressing with key studies completed
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Caravel Minerals (ASX:CVV)
OPEN ARTICLE