middle.news

How Caravel Minerals’ Adani MoU and Engineering Advances Could Transform Its Copper Project

1:22pm on Friday 27th of February, 2026 AEDT Mining
Read Story

How Caravel Minerals’ Adani MoU and Engineering Advances Could Transform Its Copper Project

1:22pm on Friday 27th of February, 2026 AEDT
Key Points
  • 90% completion of Definitive Engineering Study with reduced water use
  • Secured draft grid connection offer for 89MW winter capacity
  • MoU signed with Kutch Copper (Adani) for offtake and investment
  • Environmental approvals progressing with key studies completed
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Caravel Minerals (ASX:CVV)
OPEN ARTICLE