middle.news
How Pivotal Metals Achieved a 2.1x Copper Grade Boost at Horden Lake
9:30am on Monday 2nd of February, 2026 AEDT
•
Mining
Read Story
How Pivotal Metals Achieved a 2.1x Copper Grade Boost at Horden Lake
9:30am on Monday 2nd of February, 2026 AEDT
Key Points
Up to 2.1x copper and copper-equivalent grade uplift via XRT ore sorting
68% mass rejection with 69% copper recovery achieved in high-selectivity sorting
Potential for significant reductions in capital and operating costs
Ore sorting enables smaller plant footprint and improved environmental management
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Pivotal Metals (ASX:PVT)
OPEN ARTICLE