middle.news

How Pivotal Metals Achieved a 2.1x Copper Grade Boost at Horden Lake

9:30am on Monday 2nd of February, 2026 AEDT Mining
Read Story

How Pivotal Metals Achieved a 2.1x Copper Grade Boost at Horden Lake

9:30am on Monday 2nd of February, 2026 AEDT
Key Points
  • Up to 2.1x copper and copper-equivalent grade uplift via XRT ore sorting
  • 68% mass rejection with 69% copper recovery achieved in high-selectivity sorting
  • Potential for significant reductions in capital and operating costs
  • Ore sorting enables smaller plant footprint and improved environmental management
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Pivotal Metals (ASX:PVT)
OPEN ARTICLE