middle.news

How Beach Energy’s Waitsia Ramp-Up and LNG Cargoes Are Shaping FY26

8:44am on Thursday 5th of February, 2026 AEDT Energy
Read Story

How Beach Energy’s Waitsia Ramp-Up and LNG Cargoes Are Shaping FY26

8:44am on Thursday 5th of February, 2026 AEDT
Key Points
  • Waitsia Gas Plant achieves peak production of 165 TJ/day
  • Four LNG cargoes generate $233 million in revenue
  • Underlying NPAT declines 8% to $219 million amid higher costs
  • Liquidity strengthened to $925 million with $300 million term loan secured
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Beach Energy (ASX:BPT)
OPEN ARTICLE