middle.news

Elixir Energy Advances Lorelle-3 Well Ahead of Key Flow Tests

9:08am on Friday 6th of February, 2026 AEDT Energy
Read Story

Elixir Energy Advances Lorelle-3 Well Ahead of Key Flow Tests

9:08am on Friday 6th of February, 2026 AEDT
Key Points
  • Lorelle-3 well drilled to 2,320m in intermediate section
  • Casing and cementing underway before reservoir drilling
  • Targeting Dunk member of Tinowon Sandstone reservoir
  • Planned horizontal sidetrack and fracture stimulation by June 2026
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Elixir Energy (ASX:EXR)
OPEN ARTICLE