middle.news
Dateline Sharpens Drill Targets with New Geophysics at Colosseum Gold-REE Project
8:40am on Monday 9th of February, 2026 AEDT
•
Mining
Read Story
Dateline Sharpens Drill Targets with New Geophysics at Colosseum Gold-REE Project
8:40am on Monday 9th of February, 2026 AEDT
Key Points
Completion of high-resolution gravity, magnetic, and radiometric surveys
Integration with previous IP and magneto-telluric data to refine drill targets
Diamond drilling rigs scheduled to arrive imminently
Colosseum hosts 27.1Mt at 1.26g/t Au for 1.1Moz gold resource
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
DTR
OPEN ARTICLE