Auravelle Advances Crown Gold Project with Heritage Survey and Soil Sampling Plans
Auravelle Metals has completed a key heritage survey at its Crown Gold Project in Western Australia, setting the stage for targeted soil sampling and follow-up aircore drilling to refine gold exploration targets.
- Second heritage survey completed with Kakarra Aboriginal Corporation
- 2025 aircore drilling identified gold anomalism over 2km north-south
- Focused soil sampling planned for June quarter to refine targets
- Upcoming aircore drilling to test historical intercepts and structural targets
- Exploration activities continuing at Nuckulla Hill and Skye projects
Heritage Survey Clears Path for Next Phase
Auravelle Metals Limited (ASX, AUV) has announced the completion of its second heritage survey at the Crown Gold Project, located southeast of Kalgoorlie in Western Australia. Conducted in collaboration with the Kakarra Aboriginal Corporation RNTBC, the survey assessed all key areas planned for upcoming exploration, including significant structural zones and sites of historical drilling. This important step ensures that Auravelle can proceed with its planned aircore drilling program with cultural and environmental considerations addressed.
Building on Promising 2025 Aircore Results
The company’s maiden aircore drilling campaign in 2025 revealed gold anomalism extending over at least 2 kilometres in a north-south orientation within the Crown Project. These encouraging results have laid the groundwork for more targeted exploration. Auravelle intends to test historical drill intercepts and key structural targets, some of which are geologically linked to Black Cat Syndicate’s nearby Majestic gold mining centre, a significant +500,000-ounce operation within the Kal East 1.29 million-ounce gold project.
Soil Sampling to Sharpen Exploration Focus
Prior to the next round of aircore drilling, Auravelle plans a focused soil sampling program scheduled for the June quarter. This program will cover areas that have not previously undergone on-ground exploration, aiming to enhance the understanding of the surface geochemical profile. By integrating these new soil data with existing structural models and historical exploration results, Auravelle expects to refine its drill targets, improving the chances of identifying economically viable gold mineralisation.
Broader Exploration Momentum
Beyond Crown, Auravelle is maintaining an aggressive exploration schedule across its portfolio. Follow-up drilling at Sheoak and other prospects within the Nuckulla Hill project in South Australia is set to commence in late Q1 or early Q2 2026. Additional regional aircore drilling, geophysical surveys, and heritage assessments are also planned for Nuckulla Hill, alongside maiden exploration activities at the Skye project. These efforts underscore Auravelle’s commitment to expanding its footprint in both Western and South Australia.
Looking Ahead
Managing Director Andrew Muir expressed optimism about the path forward, highlighting the value of the maiden drilling results and the potential unlocked by the upcoming soil sampling and aircore drilling. The company’s methodical approach to refining targets and respecting cultural heritage signals a balanced strategy aimed at maximising discovery potential while maintaining community engagement.
Bottom Line?
Auravelle’s methodical groundwork and upcoming drilling programs could unlock significant new gold targets near Kalgoorlie, with results to watch closely.
Questions in the middle?
- What will the soil sampling results reveal about previously unexplored areas?
- How will the upcoming aircore drilling compare to the promising 2025 campaign?
- Could Auravelle’s targets near Black Cat Syndicate’s Majestic centre translate into a major discovery?