middle.news
Askari Metals Unveils Robust Polymetallic Results at Uis Project, Drilling Set for Q2 2026
9:46am on Monday 16th of February, 2026 AEDT
•
Mining
Read Story
Askari Metals Unveils Robust Polymetallic Results at Uis Project, Drilling Set for Q2 2026
9:46am on Monday 16th of February, 2026 AEDT
Key Points
Phase 1 trenching confirms high-grade polymetallic mineralisation at DP Pegmatite Target
Main DP pegmatite extends ~700m with average surface thickness of ~6m
Peak assay results include 3360 ppm tin, 1.25% lithium oxide, 364 ppm tantalum, 3370 ppm rubidium, and 587 ppm caesium
RC drilling planned for Q2 2026 to test and expand mineralisation
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Askari Metals (ASX:AS2)
OPEN ARTICLE