middle.news
Elixir Energy Advances Taroom Trough Gas Play with Lorelle-3 Well Progress
8:30am on Monday 16th of February, 2026 AEDT
•
Energy
Read Story
Elixir Energy Advances Taroom Trough Gas Play with Lorelle-3 Well Progress
8:30am on Monday 16th of February, 2026 AEDT
Key Points
Lorelle-3 pilot hole drilled to 3,580m with multiple Permian reservoirs intersected
Primary target Tinowon ‘Dunk’ Sandstone shows 60m thickness with 18m high-quality core recovered
Wireline logging underway to confirm reservoir quality and hydrocarbon saturation
Planned horizontal sidetrack and multi-stage fracture stimulation test scheduled before June 2026
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Elixir Energy (ASX:EXR)
OPEN ARTICLE