middle.news

Elixir Energy Advances Taroom Trough Gas Play with Lorelle-3 Well Progress

8:30am on Monday 16th of February, 2026 AEDT Energy
Read Story

Elixir Energy Advances Taroom Trough Gas Play with Lorelle-3 Well Progress

8:30am on Monday 16th of February, 2026 AEDT
Key Points
  • Lorelle-3 pilot hole drilled to 3,580m with multiple Permian reservoirs intersected
  • Primary target Tinowon ‘Dunk’ Sandstone shows 60m thickness with 18m high-quality core recovered
  • Wireline logging underway to confirm reservoir quality and hydrocarbon saturation
  • Planned horizontal sidetrack and multi-stage fracture stimulation test scheduled before June 2026
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Elixir Energy (ASX:EXR)
OPEN ARTICLE