middle.news

How Basin Energy’s Maiden Drilling Unlocked District-Scale REE and Uranium Potential

8:30am on Friday 20th of February, 2026 AEDT Mining
Read Story

How Basin Energy’s Maiden Drilling Unlocked District-Scale REE and Uranium Potential

8:30am on Friday 20th of February, 2026 AEDT
Key Points
  • Maiden drilling confirms district-scale sediment-hosted REE system
  • Significant TREO mineralisation intersected, including high-grade NdPr oxide
  • Mineralisation remains open at depth and along strike over kilometres
  • Multi-kilometre palaeochannel system prospective for roll-front uranium defined
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Basin Energy (ASX:BSN)
OPEN ARTICLE