middle.news

Li-S Energy Powers Ahead with $7.8M Grant and Australia’s First Lithium Foil Line

8:42am on Friday 20th of February, 2026 AEDT Energy
Read Story

Li-S Energy Powers Ahead with $7.8M Grant and Australia’s First Lithium Foil Line

8:42am on Friday 20th of February, 2026 AEDT
Key Points
  • Net loss reduced by 55% to $1.21 million for H1 FY2026
  • Secured $7.8 million ARENA grant to fund Phase 4 manufacturing scale-up
  • Commissioned Australia’s first lithium metal foil production line
  • Developed high-power lithium sulfur cell with 15x typical power output
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Li-S Energy (ASX:LIS)
OPEN ARTICLE