middle.news

Elixir Energy Advances Lorelle-3H Well with Horizontal Drilling Underway

8:30am on Monday 2nd of March, 2026 AEDT Energy
Read Story

Elixir Energy Advances Lorelle-3H Well with Horizontal Drilling Underway

8:30am on Monday 2nd of March, 2026 AEDT
Key Points
  • Heel of Lorelle-3H well drilled and cased into Tinowon ‘Dunk’ Sandstone
  • SLB optimisation study guides horizontal drilling placement
  • Over 1,000 metres of horizontal well planned for multi-stage fracture stimulation
  • Flow testing scheduled by end-June 2026 to demonstrate commercial gas and condensate flow
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Elixir Energy (ASX:EXR)
OPEN ARTICLE