middle.news
Elixir Energy Advances Lorelle-3H Well with Horizontal Drilling Underway
8:30am on Monday 2nd of March, 2026 AEDT
•
Energy
Read Story
Elixir Energy Advances Lorelle-3H Well with Horizontal Drilling Underway
8:30am on Monday 2nd of March, 2026 AEDT
Key Points
Heel of Lorelle-3H well drilled and cased into Tinowon ‘Dunk’ Sandstone
SLB optimisation study guides horizontal drilling placement
Over 1,000 metres of horizontal well planned for multi-stage fracture stimulation
Flow testing scheduled by end-June 2026 to demonstrate commercial gas and condensate flow
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Elixir Energy (ASX:EXR)
OPEN ARTICLE