middle.news

PC Gold Uncovers 80m Southern Extension at Spring Hill with High-Grade Gold

8:34am on Tuesday 3rd of March, 2026 AEDT Mining
Read Story

PC Gold Uncovers 80m Southern Extension at Spring Hill with High-Grade Gold

8:34am on Tuesday 3rd of March, 2026 AEDT
Key Points
  • 14.9m @ 3.84 g/t Au intercept including 0.98m @ 30.6 g/t Au
  • Main Zone strike extended 80m south beyond previous resource boundary
  • Up to 500m additional southern strike potential identified
  • 7,800m Phase 1 drilling program underway targeting extensions
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about PC Gold (ASX:PC2)
OPEN ARTICLE