middle.news
How Theta Gold’s Modular Build Could Fast-Track TGME Gold Production
9:38am on Wednesday 4th of March, 2026 AEDT
•
Mining
Read Story
How Theta Gold’s Modular Build Could Fast-Track TGME Gold Production
9:38am on Wednesday 4th of March, 2026 AEDT
Key Points
Phase 2 construction underway with SMPP contracts awarded to PICM and RM Process
Modular steel fabrication off-site to streamline installation and reduce risks
Synergy cost savings expected as contractors already mobilised on site
TGME Gold Project targets 100,000+ ounces gold production annually, scalable to 160,000 ounces
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Theta Gold Mines (ASX:TGM)
OPEN ARTICLE