middle.news
Australian Critical Minerals Begins Drilling at Flint’s Promising Gold-Silver System
8:34am on Friday 6th of March, 2026 AEDT
•
Mining
Read Story
Australian Critical Minerals Begins Drilling at Flint’s Promising Gold-Silver System
8:34am on Friday 6th of March, 2026 AEDT
Key Points
SFP Drilling SAC appointed for maiden diamond drilling program
Phase 1 includes four HQ diamond drillholes totaling ~1,850m
Drilling targets a 4km strike length high-sulphidation epithermal gold-silver system
Drill targets supported by comprehensive geophysical and geochemical data
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Australian Critical Minerals (ASX:ACM)
OPEN ARTICLE