middle.news

Australian Critical Minerals Begins Drilling at Flint’s Promising Gold-Silver System

8:34am on Friday 6th of March, 2026 AEDT Mining
Read Story

Australian Critical Minerals Begins Drilling at Flint’s Promising Gold-Silver System

8:34am on Friday 6th of March, 2026 AEDT
Key Points
  • SFP Drilling SAC appointed for maiden diamond drilling program
  • Phase 1 includes four HQ diamond drillholes totaling ~1,850m
  • Drilling targets a 4km strike length high-sulphidation epithermal gold-silver system
  • Drill targets supported by comprehensive geophysical and geochemical data
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Australian Critical Minerals (ASX:ACM)
OPEN ARTICLE