middle.news

How Horizon Minerals Is Fast-Tracking Black Swan’s Gold Processing Future

8:32am on Friday 6th of March, 2026 AEDT Mining
Read Story

How Horizon Minerals Is Fast-Tracking Black Swan’s Gold Processing Future

8:32am on Friday 6th of March, 2026 AEDT
Key Points
  • Orders placed for pre-leach thickener and SAG and ball mill motors with variable speed drives
  • Front End Engineering Design (FEED) studies progressing, completion expected in 4-5 weeks
  • Early procurement aims to de-risk construction schedule ahead of full EPC contract award
  • Operational readiness underway for initial ore feed sources: Boorara, Burbanks, Cannon
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Horizon Minerals (ASX:HRZ)
OPEN ARTICLE