middle.news
How Podium’s New Concentrator Unlocks High-Grade Metals at Parks Reef
8:26am on Monday 9th of March, 2026 AEDT
•
Mining
Read Story
How Podium’s New Concentrator Unlocks High-Grade Metals at Parks Reef
8:26am on Monday 9th of March, 2026 AEDT
Key Points
Concentrator recovers ~73% of key 3E metals (Pt, Pd, Au) from high-grade hanging wall
Two discrete high-grade PGM products totaling 115 g/t 3E, ~40% grade uplift over bulk sulphide
Copper recovery improved to 76%, enhancing overall process efficiency
Flowsheet flexibility enables selective mining and feed grade optimisation
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
PODIUM MINERALS (ASX:POD)
OPEN ARTICLE