middle.news
Galilee Energy Confirms Zydeco-1 Well Drill-Ready, Targets 8 Bcf Gas in Q2 2026
8:32am on Tuesday 10th of March, 2026 AEDT
•
Energy
Read Story
Galilee Energy Confirms Zydeco-1 Well Drill-Ready, Targets 8 Bcf Gas in Q2 2026
8:32am on Tuesday 10th of March, 2026 AEDT
Key Points
Enhanced 3D seismic confirms optimal Zydeco-1 well location
Targets up to 8 Bcf gas and 0.5 MMbbl condensate
Spud planned for Q2 2026 with first production ~6 months post-drilling
Project benefits from existing infrastructure and nearby producing fields
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
GALILEE ENERGY (ASX:GLL)
OPEN ARTICLE