middle.news

Galilee Energy Confirms Zydeco-1 Well Drill-Ready, Targets 8 Bcf Gas in Q2 2026

8:32am on Tuesday 10th of March, 2026 AEDT Energy
Read Story

Galilee Energy Confirms Zydeco-1 Well Drill-Ready, Targets 8 Bcf Gas in Q2 2026

8:32am on Tuesday 10th of March, 2026 AEDT
Key Points
  • Enhanced 3D seismic confirms optimal Zydeco-1 well location
  • Targets up to 8 Bcf gas and 0.5 MMbbl condensate
  • Spud planned for Q2 2026 with first production ~6 months post-drilling
  • Project benefits from existing infrastructure and nearby producing fields
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about GALILEE ENERGY (ASX:GLL)
OPEN ARTICLE