middle.news
Corazon Mining Launches Maiden Diamond Drilling at Two Pools Gold Project
8:34am on Wednesday 11th of March, 2026 AEDT
•
Mining
Read Story
Corazon Mining Launches Maiden Diamond Drilling at Two Pools Gold Project
8:34am on Wednesday 11th of March, 2026 AEDT
Key Points
Executed diamond drilling contract with K-Drill for Two Pools project
Four drill holes planned, including one deep hole targeting 400m depth
Focus on defining structural controls and down-plunge extensions of mineralisation
Targets historical high-grade gold intercepts up to 12m at 8.9g/t Au
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
CORAZON MINING (ASX:CZN)
OPEN ARTICLE