middle.news

Corazon Mining Launches Maiden Diamond Drilling at Two Pools Gold Project

8:34am on Wednesday 11th of March, 2026 AEDT Mining
Read Story

Corazon Mining Launches Maiden Diamond Drilling at Two Pools Gold Project

8:34am on Wednesday 11th of March, 2026 AEDT
Key Points
  • Executed diamond drilling contract with K-Drill for Two Pools project
  • Four drill holes planned, including one deep hole targeting 400m depth
  • Focus on defining structural controls and down-plunge extensions of mineralisation
  • Targets historical high-grade gold intercepts up to 12m at 8.9g/t Au
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about CORAZON MINING (ASX:CZN)
OPEN ARTICLE