middle.news
How Horizon Minerals Plans to Power Black Swan Hub with Boorara Stockpiles
8:38am on Friday 13th of March, 2026 AEDT
•
Mining
Read Story
How Horizon Minerals Plans to Power Black Swan Hub with Boorara Stockpiles
8:38am on Friday 13th of March, 2026 AEDT
Key Points
Completion of current mining phase at Boorara Gold Project
Mutual termination of Ore Purchase Agreement with Paddington Gold Mine
460,000 tonnes of gold ore stockpiled at Boorara (14.2koz Au)
Stockpiles to feed Black Swan Processing Hub commissioning in mid-2027
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Horizon Minerals (ASX:HRZ)
OPEN ARTICLE