middle.news

How Horizon Minerals Plans to Power Black Swan Hub with Boorara Stockpiles

8:38am on Friday 13th of March, 2026 AEDT Mining
Read Story

How Horizon Minerals Plans to Power Black Swan Hub with Boorara Stockpiles

8:38am on Friday 13th of March, 2026 AEDT
Key Points
  • Completion of current mining phase at Boorara Gold Project
  • Mutual termination of Ore Purchase Agreement with Paddington Gold Mine
  • 460,000 tonnes of gold ore stockpiled at Boorara (14.2koz Au)
  • Stockpiles to feed Black Swan Processing Hub commissioning in mid-2027
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Horizon Minerals (ASX:HRZ)
OPEN ARTICLE