middle.news

GoldArc Validates High-Grade Gold Continuity at Mt Stirling with Diamond Drilling

8:30am on Monday 16th of March, 2026 AEDT Mining
Read Story

GoldArc Validates High-Grade Gold Continuity at Mt Stirling with Diamond Drilling

8:30am on Monday 16th of March, 2026 AEDT
Key Points
  • High-grade gold intercepts up to 30.2 g/t confirmed at Mt Stirling and Stirling Well
  • PQ-diameter diamond drilling supports final metallurgical and geotechnical studies
  • Ongoing extensive RC and AC drilling programs across multiple Leonora North deposits
  • Resource base expansion efforts targeting over 200,000 ounces of gold
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Goldarc Resources (ASX:GA8)
OPEN ARTICLE