middle.news
GoldArc Validates High-Grade Gold Continuity at Mt Stirling with Diamond Drilling
8:30am on Monday 16th of March, 2026 AEDT
•
Mining
Read Story
GoldArc Validates High-Grade Gold Continuity at Mt Stirling with Diamond Drilling
8:30am on Monday 16th of March, 2026 AEDT
Key Points
High-grade gold intercepts up to 30.2 g/t confirmed at Mt Stirling and Stirling Well
PQ-diameter diamond drilling supports final metallurgical and geotechnical studies
Ongoing extensive RC and AC drilling programs across multiple Leonora North deposits
Resource base expansion efforts targeting over 200,000 ounces of gold
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Goldarc Resources (ASX:GA8)
OPEN ARTICLE