middle.news
Lion Rock Uncovers High-Grade Rutile Over 24km at Minta Project
9:26am on Wednesday 18th of March, 2026 AEDT
•
Mining
Read Story
Lion Rock Uncovers High-Grade Rutile Over 24km at Minta Project
9:26am on Wednesday 18th of March, 2026 AEDT
Key Points
Insitu rutile grades up to 2.6% with intercepts up to 4m at 1.8%
High-grade rutile mineralisation confirmed over 24km strike in Ayong Yerap Basin
Stage 2 infill drilling underway across 507km² with 488 holes completed
Drilling teams expanded to target alluvial basins rich in rutile, zircon, and monazite
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
LION ROCK MINERALS (ASX:LRM)
OPEN ARTICLE