middle.news

How Brookside Energy’s SWISH Wells Boosted Proved Reserves by 7% in 2025

8:32am on Thursday 19th of March, 2026 AEDT Energy
Read Story

How Brookside Energy’s SWISH Wells Boosted Proved Reserves by 7% in 2025

8:32am on Thursday 19th of March, 2026 AEDT
Key Points
  • Total proved plus probable (2P) reserves reach 12.52 MMBOE
  • Proved developed producing (PDP) reserves increase ~5% to 2.80 MMBOE
  • Total proved (1P) reserves grow ~7% to 5.33 MMBOE
  • Reserve replacement exceeds production across all categories
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about BROOKSIDE ENERGY (ASX:BRK)
OPEN ARTICLE