middle.news

Dalaroo Metals Unveils 2.5 km High-Grade Gold Corridor at Bondoukou

8:32am on Thursday 19th of March, 2026 AEDT Mining
Read Story

Dalaroo Metals Unveils 2.5 km High-Grade Gold Corridor at Bondoukou

8:32am on Thursday 19th of March, 2026 AEDT
Key Points
  • 2.5 km by 400 m structurally controlled gold corridor defined
  • High-grade rock-chip assays up to 17.95 g/t gold
  • Target lies within a broader 9.5 km gold anomalous zone
  • Extensive artisanal mining activity supports surface mineralisation
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Dalaroo Metals (ASX:DAL)
OPEN ARTICLE