middle.news
Ragnar Metals Validates Gold Extensions at Harnäs, Drilling Set to Begin
8:28am on Friday 20th of March, 2026 AEDT
•
Mining
Read Story
Ragnar Metals Validates Gold Extensions at Harnäs, Drilling Set to Begin
8:28am on Friday 20th of March, 2026 AEDT
Key Points
High-grade gold sampling confirms extensions to known mineralised veins
Channel samples up to 3m at 3.3 g/t Au, rock chips up to 36.6 g/t Au
Mineralisation remains open along strike, especially to the east
All regulatory permits secured for maiden diamond drilling program
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Ragnar Metals (ASX:RAG)
OPEN ARTICLE