middle.news

Ragnar Metals Validates Gold Extensions at Harnäs, Drilling Set to Begin

8:28am on Friday 20th of March, 2026 AEDT Mining
Read Story

Ragnar Metals Validates Gold Extensions at Harnäs, Drilling Set to Begin

8:28am on Friday 20th of March, 2026 AEDT
Key Points
  • High-grade gold sampling confirms extensions to known mineralised veins
  • Channel samples up to 3m at 3.3 g/t Au, rock chips up to 36.6 g/t Au
  • Mineralisation remains open along strike, especially to the east
  • All regulatory permits secured for maiden diamond drilling program
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Ragnar Metals (ASX:RAG)
OPEN ARTICLE