middle.news
Australian Critical Minerals Mobilises Drilling at Flint Gold-Silver Project
9:48am on Wednesday 25th of March, 2026 AEDT
•
Mining
Read Story
Australian Critical Minerals Mobilises Drilling at Flint Gold-Silver Project
9:48am on Wednesday 25th of March, 2026 AEDT
Key Points
Maiden drilling campaign to commence at Flint gold-silver project on March 31, 2026
Drilling contractor SFP Drilling SAC mobilising to site on March 28
Project targets two high-sulphidation epithermal systems within a 4 km hydrothermal corridor
Access construction reveals significant hydrothermal alteration supporting exploration model
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
AUSTRALIAN CRITICAL MINERALS (ASX:ACM)
OPEN ARTICLE