middle.news
Magnum Mining Uncovers Over 100g/t Gold and 18% Copper at Parker Project
1:02pm on Tuesday 24th of March, 2026 AEDT
•
Mining
Read Story
Magnum Mining Uncovers Over 100g/t Gold and 18% Copper at Parker Project
1:02pm on Tuesday 24th of March, 2026 AEDT
Key Points
High-grade gold assays exceeding 100 g/t at Red Breccia
Copper assays reaching up to 18.35% at Eagle Nest
457 soil and 131 rock-chip samples collected across three key targets
Mineralisation aligned with interpreted structural corridors over ~5 km strike length
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Magnum Mining and Exploration (ASX:MGU)
OPEN ARTICLE