middle.news
Botala Energy Spuds First Commercial Well to Unlock Botswana Gas Potential
9:46am on Monday 30th of March, 2026 AEDT
•
Energy
Read Story
Botala Energy Spuds First Commercial Well to Unlock Botswana Gas Potential
9:46am on Monday 30th of March, 2026 AEDT
Key Points
Spudding of well 3.5B as central production well in Project Pitse pilot cluster
Well designed to achieve commercial gas flow rates for LNG development
Supports pathway to 3.5 petajoules per year of gas production
Dewatering network of four support wells fully operational
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
BOTALA ENERGY (ASX:BTE)
OPEN ARTICLE