middle.news
How Aruma’s EM Survey Unlocked New Depths at Tillex Copper-Silver Project
8:34am on Wednesday 1st of April, 2026 AEDT
•
Mining
Read Story
How Aruma’s EM Survey Unlocked New Depths at Tillex Copper-Silver Project
8:34am on Wednesday 1st of April, 2026 AEDT
Key Points
FLTDEM survey identifies two major EM conductors at Tillex
Main Conductor extends strike length to 600m and depth beyond 400m
East Conductor adds new high-conductivity target east of deposit
Maiden drilling program scheduled to start April 2026
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
ARUMA RESOURCES (ASX:AAJ)
OPEN ARTICLE