middle.news

How Aruma’s EM Survey Unlocked New Depths at Tillex Copper-Silver Project

8:34am on Wednesday 1st of April, 2026 AEDT Mining
Read Story

How Aruma’s EM Survey Unlocked New Depths at Tillex Copper-Silver Project

8:34am on Wednesday 1st of April, 2026 AEDT
Key Points
  • FLTDEM survey identifies two major EM conductors at Tillex
  • Main Conductor extends strike length to 600m and depth beyond 400m
  • East Conductor adds new high-conductivity target east of deposit
  • Maiden drilling program scheduled to start April 2026
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about ARUMA RESOURCES (ASX:AAJ)
OPEN ARTICLE