middle.news

GoldArc Confirms Robust High-Grade Gold System at Eclipse, Progressing Maiden Resource

8:34am on Tuesday 7th of April, 2026 AEST Mining
Read Story

GoldArc Confirms Robust High-Grade Gold System at Eclipse, Progressing Maiden Resource

8:34am on Tuesday 7th of April, 2026 AEST
Key Points
  • Consistent high-grade gold intercepts across 13 holes at Eclipse prospect
  • Notable assays include 4m at 9.43g/t Au and 9m at 2.54g/t Au from shallow depths
  • Results underpin plans for maiden Mineral Resource Estimate and pit optimisation
  • Eclipse located adjacent to Orion-Sapphire deposits with combined 48,000oz MRE
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about GOLDARC RESOURCES (ASX:GA8)
OPEN ARTICLE