middle.news
Elixir Energy Initiates Feasibility Study for Taroom Trough Gas Pipeline to Wallumbilla Hub
8:34am on Friday 10th of April, 2026 AEST
•
Energy
Read Story
Elixir Energy Initiates Feasibility Study for Taroom Trough Gas Pipeline to Wallumbilla Hub
8:34am on Friday 10th of April, 2026 AEST
Key Points
Early Works Agreement signed with APA Group for pipeline feasibility
Study compares two pipeline routes to Wallumbilla Gas Hub
Feasibility results including capital estimate expected in 12 weeks
Flow testing of Lorelle-3H appraisal well scheduled for June 2026
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Elixir Energy (ASX:EXR)
OPEN ARTICLE