middle.news
GoldArc Advances Mt Stirling Mine Plans with Partner-Funded High-Grade Drilling
8:40am on Monday 13th of April, 2026 AEST
•
Mining
Read Story
GoldArc Advances Mt Stirling Mine Plans with Partner-Funded High-Grade Drilling
8:40am on Monday 13th of April, 2026 AEST
Key Points
Partner-funded 34,000m grade control drilling delivers high-grade gold continuity
Notable intercepts include 10m at 8.04g/t Au and 9m at 6.32g/t Au
GoldArc retains 50% net profit share without bearing drilling costs
Additional drilling underway at Sapphire, Orion, and historic Cosmopolitan mine
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Goldarc Resources (ASX:GA8)
OPEN ARTICLE