middle.news

Viking Mines Advances Low-Cost Tungsten Strategy at Linka with Stockpile and Tailings Evaluation

9:54am on Tuesday 14th of April, 2026 AEST Mining
Read Story

Viking Mines Advances Low-Cost Tungsten Strategy at Linka with Stockpile and Tailings Evaluation

9:54am on Tuesday 14th of April, 2026 AEST
Key Points
  • Systematic sampling underway to quantify tailings and stockpile grade and volume
  • Metallurgical testwork progressing to refine processing costs and plant design
  • Fieldwork validates geological targets including an 820m mineralised corridor
  • Phase 2 mapping and trench sampling scheduled ahead of maiden drilling
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Viking Mines (ASX:VKA)
OPEN ARTICLE