middle.news

FIN Resources Confirms Extensive Sulphide Mineralisation at Cabin Lake Arrow Prospect

8:40am on Wednesday 15th of April, 2026 AEST Mining
Read Story

FIN Resources Confirms Extensive Sulphide Mineralisation at Cabin Lake Arrow Prospect

8:40am on Wednesday 15th of April, 2026 AEST
Key Points
  • Three drillholes at Arrow confirm 114m cumulative sulphide mineralisation
  • Drilling at Beaver Prospect commenced with encouraging sulphide observations
  • Ground magnetic survey mostly complete; downhole and surface IP surveys underway
  • Visual logging supports geological model; assay results pending
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Fin Resources (ASX:FIN)
OPEN ARTICLE