middle.news

Hazer Completes Key Design Package and Secures Graphite Offtake LOI

8:52am on Monday 20th of April, 2026 AEST Energy
Read Story

Hazer Completes Key Design Package and Secures Graphite Offtake LOI

8:52am on Monday 20th of April, 2026 AEST
Key Points
  • Process Design Package finalised enabling standardised 30ktpa hydrogen plant design
  • Non-binding graphite offtake LOI signed with Green Steel WA linked to anthracite pricing
  • Graphite qualified for concrete and asphalt, opening infrastructure markets
  • Operating cash burn cut 16% quarter-on-quarter, cash balance at $15.3 million
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Hazer (ASX:HZR)
OPEN ARTICLE