middle.news
Lithium Energy Completes Bajool Drilling with Key Assays Pending
1:42pm on Monday 20th of April, 2026 AEST
•
Mining
Read Story
Lithium Energy Completes Bajool Drilling with Key Assays Pending
1:42pm on Monday 20th of April, 2026 AEST
Key Points
Diamond drill hole BAJ0050 reached 648.5 metres depth
83 air core holes completed across Bajool Prospect footprint
Assays for diamond core samples pending, RC and AC results show geochemical vectors
No significant copper mineralisation detected in air core bottom samples
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Lithium Energy (ASX:LEL)
OPEN ARTICLE