middle.news

Metro Mining Reports 69.6Mt Ore Reserves After 2025 Depletion at Bauxite Hills

8:54am on Wednesday 22nd of April, 2026 AEST Mining
Read Story

Metro Mining Reports 69.6Mt Ore Reserves After 2025 Depletion at Bauxite Hills

8:54am on Wednesday 22nd of April, 2026 AEST
Key Points
  • Ore Reserves stand at 69.6 million wet tonnes with 49.7% alumina
  • Mineral Resources total 107.4 million dry tonnes, down 7 million from 2024
  • No new Mineral Resources or category upgrades recorded in 2025
  • Mining method remains open-cut direct shipping ore (DSO) with minimal processing
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Metro Mining (ASX:MMI)
OPEN ARTICLE