middle.news

Gateway Mining Extends Haflinger Gold Strike to 4km with New High-Grade Lodes

9:12am on Monday 4th of May, 2026 AEST Mining
Read Story

Gateway Mining Extends Haflinger Gold Strike to 4km with New High-Grade Lodes

9:12am on Monday 4th of May, 2026 AEST
Key Points
  • Oxide gold mineralisation at Haflinger now spans 4km strike
  • High-grade gold intercepts extend mineralisation 220m southward
  • Primary gold mineralisation confirmed at Hummer over 200m strike
  • Well-funded with $15.7m cash and $5.6m in liquid ASX securities
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Gateway Mining (ASX:GML)
OPEN ARTICLE