middle.news

PC Gold Extends High-Grade Gold Mineralisation at Spring Hill with Ongoing Drilling

8:44am on Monday 4th of May, 2026 AEST Mining
Read Story

PC Gold Extends High-Grade Gold Mineralisation at Spring Hill with Ongoing Drilling

8:44am on Monday 4th of May, 2026 AEST
Key Points
  • Main Zone extended 120m south beyond current resource
  • High-grade intercepts within existing pit optimisation shell
  • Three rigs mobilised to increase drilling capacity
  • Updated Mineral Resource Estimate due June 2026
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about PC Gold (ASX:PC2)
OPEN ARTICLE