middle.news

Avira Resources Extends Tenure and Prepares Drilling at High-Grade Mt Cattlin Gold Project

9:52am on Monday 11th of May, 2026 AEST Mining
Read Story

Avira Resources Extends Tenure and Prepares Drilling at High-Grade Mt Cattlin Gold Project

9:52am on Monday 11th of May, 2026 AEST
Key Points
  • Exploration Licence E74/401 extended to March 2028
  • 4,500m RC drilling fully permitted across four prospects
  • Exceptional historical grades confirmed, including 131 g/t Au intercept
  • Maiden Mineral Resource Estimate targeted for Q4 2026
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Avira Resources (ASX:AVW)
OPEN ARTICLE