middle.news

Estrella Reports 27,371 Tonne High-Grade Manganese Stockpile at Ira Miri

9:20am on Monday 11th of May, 2026 AEST Mining
Read Story

Estrella Reports 27,371 Tonne High-Grade Manganese Stockpile at Ira Miri

9:20am on Monday 11th of May, 2026 AEST
Key Points
  • 27,371 tonnes manganese stockpile with 4,984 tonnes at 49.38% Mn
  • In-situ sampling confirms ultra high-grade mineralisation up to 60.22% Mn
  • Mineralisation remains open below pit floor and along pit walls
  • Shipment preparations and export approvals underway
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Estrella Resources (ASX:ESR)
OPEN ARTICLE