middle.news
Elixir Energy Confirms Recoverable Gas at Diona-1 Well
10:00am on Thursday 1st of January, 1970 AEST
•
Energy
Read Story
Elixir Energy Confirms Recoverable Gas at Diona-1 Well
10:00am on Thursday 1st of January, 1970 AEST
Key Points
Diona-1 confirms recoverable overpressured gas and condensate
45% of stimulation fluids recovered during flowback
Diona sub-block adds 184 km² to Taroom Trough acreage
Artificial lift considered to accelerate fluid recovery
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Elixir Energy (ASX:EXR)
OPEN ARTICLE