middle.news

Elixir Energy Confirms Recoverable Gas at Diona-1 Well

10:00am on Thursday 1st of January, 1970 AEST Energy
Read Story

Elixir Energy Confirms Recoverable Gas at Diona-1 Well

10:00am on Thursday 1st of January, 1970 AEST
Key Points
  • Diona-1 confirms recoverable overpressured gas and condensate
  • 45% of stimulation fluids recovered during flowback
  • Diona sub-block adds 184 km² to Taroom Trough acreage
  • Artificial lift considered to accelerate fluid recovery
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Elixir Energy (ASX:EXR)
OPEN ARTICLE