middle.news
Wildcat Advances Tabba Tabba DFS with Optimised Mine Plan and Strong Metallurgical Results
8:51am on Monday 18th of May, 2026 AEST
•
Mining
Read Story
Wildcat Advances Tabba Tabba DFS with Optimised Mine Plan and Strong Metallurgical Results
8:51am on Monday 18th of May, 2026 AEST
Key Points
DFS aims to accelerate Stage 2 plant expansion to 4.5Mtpa
Spodumene concentrate grades 5.65% Li2O with low iron confirmed
Tantalum and petalite processing included to enhance economics
Environmental approvals nearing submission
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Wildcat Resources (ASX:WC8)
OPEN ARTICLE