middle.news
Catalyst Metals Unveils Low-Cost Expansion Study to Boost Plutonic Mill Capacity
8:26am on Tuesday 19th of May, 2026 AEST
•
Mining
Read Story
Catalyst Metals Unveils Low-Cost Expansion Study to Boost Plutonic Mill Capacity
8:26am on Tuesday 19th of May, 2026 AEST
Key Points
Study proposes expanding Plutonic Mill from 2.0Mtpa to up to 3.0Mtpa
Refurbishment of second circuit (PP2) estimated at A$50–75 million
Expansion leverages existing infrastructure, minimising capital intensity
Current 10-year plan targets doubling production to ±200koz annually
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Catalyst Metals (ASX:CYL)
OPEN ARTICLE