middle.news
Gibb River Diamonds Reports Phase 1 Drilling Results at Edjudina Gold Project with Plans for Phase 2
9:59am on Wednesday 20th of May, 2026 AEST
•
Mining
Read Story
Gibb River Diamonds Reports Phase 1 Drilling Results at Edjudina Gold Project with Plans for Phase 2
9:59am on Wednesday 20th of May, 2026 AEST
Key Points
27 aircore holes drilled for 830 metres in April 2026
Gold mineralisation encountered at lower tenor than anticipated
Weather disruptions caused early rig demobilisation
Phase 2 drilling planned to complete unfinished targets
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Gibb River Diamonds (ASX:GIB)
OPEN ARTICLE