middle.news
DPM Metals Extends High-Grade Gold Zone at Chelopech with New Deep Drilling Results
10:00am on Thursday 1st of January, 1970 AEST
•
Mining
Read Story
DPM Metals Extends High-Grade Gold Zone at Chelopech with New Deep Drilling Results
10:00am on Thursday 1st of January, 1970 AEST
Key Points
High-grade intercepts up to 15.28 g/t AuEq over 58 metres
Mineralized zone defined over 170m strike, 130m width, 300m depth
Wedge Zone Deep remains open for expansion along strike and down-dip
Initial mineral resource estimate targeted by end of 2026
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Dpm Metals (ASX:DPM)
OPEN ARTICLE