middle.news

DPM Metals Extends High-Grade Gold Zone at Chelopech with New Deep Drilling Results

10:00am on Thursday 1st of January, 1970 AEST Mining
Read Story

DPM Metals Extends High-Grade Gold Zone at Chelopech with New Deep Drilling Results

10:00am on Thursday 1st of January, 1970 AEST
Key Points
  • High-grade intercepts up to 15.28 g/t AuEq over 58 metres
  • Mineralized zone defined over 170m strike, 130m width, 300m depth
  • Wedge Zone Deep remains open for expansion along strike and down-dip
  • Initial mineral resource estimate targeted by end of 2026
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Dpm Metals (ASX:DPM)
OPEN ARTICLE